Building the Future 2020

Construction Update for the Week of April 29, 2019

Top Activities This Week

• PLAM in auditorium.A look inside the new Boiling Springs High School
• Acoustical cloud framing in the auditorium.
• Glass handrail system install C wing.
• Painting in the auxiliary gym and main gym.
• Carpet install started in the media center.
• Paving repairs started.
• Concrete sidewalks at the main entrance.
• Summer work – underground MEP rough in and foundation CMU.

Upcoming Activities

• PLAM install in E2 lobby.A look inside the new Boiling Springs High School
• Scoreboard install.
• Gym Flooring install.
• Texas granite in B upper level hallway.
• OSF overhead inspection for F1, F2, and A east.
• Summer work – slab prep and pour.

Front Entrance of the New BSHSCourtyard of the New BSHSCafeteria of the New BSHSRendering of Gym Area at the new BSHSRendering of the courtyard at the new BSHSRendering of the media center at the new BSHS


This page is dedicated to providing updates on the construction of the new Boiling Springs High School and the relocation of the Boiling Springs High School 9th Grade Campus to the existing BSHS facility.  The project is set to be completed during the 2020-21 school year. 
You can click here for answers to FAQs about the project.


Building the Future 2020 Logo

Boiling Springs High School Logo

Thompson Turner Construction Logo


Jumper Carter Sease Architects Logo

Website by SchoolMessenger Presence. © 2019 West Corporation. All rights reserved.