Construction Update for the Week of June 3, 2019

Top Activities This Week

• PLAM in auditorium lobby. Inside the new Boiling Springs High School
• Serving line casework, countertops and food shields.
• Glass handrail system install at Cafeteria
• Wood flooring in the main gym complete.
• Fire alarm inspections for classroom wings.
• Smart board install and floor waxing in progress.
• Overhead rough in for E1 wing.
• Landscaping in the courtyard

Upcoming Activities

• PLAM completion in the auditorium lobby. Inside the new Boiling Springs High School
• Terrazzo flooring completion.
• MEP overhead rough in for E1 wing.
• Acoustical panel install in F2 & E2.
• Aluminum bleacher install in the main and auxiliary gym.
• DHEC inspection.
• 3rd party emergency light and egress light inspection for classroom wings.
• Summer work –Steel erection.

Front Entrance of the New BSHSCourtyard of the New BSHSCafeteria of the New BSHSRendering of Gym Area at the new BSHSRendering of the courtyard at the new BSHSRendering of the media center at the new BSHS


This page is dedicated to providing updates on the construction of the new Boiling Springs High School and the relocation of the Boiling Springs High School 9th Grade Campus to the existing BSHS facility.  The project is set to be completed during the 2020-21 school year. 
You can click here for answers to FAQs about the project.




Boiling Springs High School Logo


Thompson Turner Construction Logo



Jumper Carter Sease Architects Logo

Website by SchoolMessenger Presence. © 2019 West Corporation. All rights reserved.